Pre-Feasibility Study and Conceptual Architecture New Airport Cartagena / Colombia - SKCG

Contracting: CONECTA CARIBE - 2016

The main project was the development of a brand-new airport infrastructure, including airside runways, taxiways, apron, and land side passenger terminal, cargo terminal and support facilities, all under the RAC / IATA / ICAO regulations for a domestic and international operation, to attend the projected demand on the horizon of 2025 until 2070.

The 1st terminal concept was a 45,000 m2 building, for 7.3 million pax/year, with an expansion planning according to the future projection for Airside, and Landside infrastructures.