Architectural Design & Capacity Study // Montería >

Contracting: AIRPLAN – 2009-2015

According with the Investment plan to AIRPLAN S.A private operator, the project involved the architectural designs for the terminal expansion, according to the projected demand for 2030.
The main project has a reconfiguration for Main hall, Boarding room, Baggage claim, Check-in counters, and commercial areas.

The final area designed was 8.700 m2 in the whole terminal building expansion.

At this passenger terminal, SCADIA SAS has been involved at the architectural design of 12.000 m2, for all the improvements made from 2008 to 2015.

Additional designs were necessary for Cargo terminal and Fire station support buildings.