Terminal Design // San Andrés >>

 Contracting: CASYP – 2007

 

Scadia in 2007 and 2008 developed the projects relating to the modernatation in the passenger terminal "Gustavo Rojas" Airport  in the San Andres island for the firm Casyp S.A, within works in the following aspects:

 

- Inventory and current operational and functional status.
- Development Study of projection of passengers.
- Analysis of current state, definition of fluxes and calculation of operational areas under IATA regulations.
- Elaboration of architectural design and construction plans for remodeling and expansion of passenger terminal building with an area of 19,800 m².