Client:
EASTERN AIRPORTS
Category:
Conceptual Development and Capacity and Demand Study.
Start Year:
2012
Year Completed:
2012

Research and Planning

Airport expansion study on an 18-hectare site on the eastern side of the runway, where a new apron, a terminal building, and an access road network will be constructed.

The scope of the study included:

  • Assessment of the airport's current condition.
  • Passenger Demand Study and Forecast.
  • Calculation of platform and building areas
  • Passenger Terminal and Control Tower.
  • Development of a road plan for access routes and internal circulation.
  • Location of support facilities.
  • Conceptual architectural design of the terminal building.

For the study, the corresponding final report and project document were developed during the basic design phase.