The scope of the project required an analysis of airport planning solutions based on RAC, IATA, and ICAO regulations to facilitate the transition of operations at these airports and thereby meet projected demand over a 30-year horizon.
The main activities were:
The Master Plan called for the development of construction projects covering an area of approximately 50,000 m² and the planning of airside improvements exceeding 300,000 m², in line with the ICAO operational code migration and the projected future demand for each airport.
© Copyright Scadia Consultores 2026