Client:
AVIANCA
Category:
Studies and Designs for the Air Bridge Terminal (TPA).
Start Year:
2006
Year Completed:
2009

Planning and Engineering

With the goal of upgrading operations at the Puente Aéreo Terminal, architectural modernization studies and designs were carried out for the passenger terminal building; the project included a redesign of the gate positions to expand the terminal’s functional capacity.

The project also included an analysis of the required IATA standards, and all architectural solutions associated with the airline’s proposed modernization and expansion plan were developed in detail.

The main activities focused on:

  • Capacity Studies for the Passenger Terminal.
  • Architectural designs: 15,000 m².
  • Coordination with engineering teams.