Conceptual development and capacity study
Simón Bolívar International Airport
Santa Marta - Colombia
Client: AEROPUERTOS DE ORIENTE - 2012
A new passenger terminal option was studied to define the best development alternative for a new passanger terminal building.
The main activities was:
- Current facilities evaluation under IATA/ICAO regulations
- Passenger's projection analysis
- Apron areas analysis
- Passenger terminal and control tower analysis
- Urban develop alternatives
- Support facilities location
- Conceptual architectural development
- Conceptual main planning to 2035