Maintenance Facilities ML Designs
El Dorado International Airport / Bogotá - Colombia

Client: AVIANCA S.A 2019 - 2020

SCADIA S.A.S develop all architectural project and technical coordination whit the engineering designers SETEC, all based at BIM development for a construction detail level.


Feasability Design Stage for the APP New Cartagena Airport SKCG
New International Airport Cartagena - Colombia

Client: AECOM 2018 - 2019

The project involve architectural designs and technical coordination for all buildings requested for a new international airport initiative.


Designs and Architectural Studies for a new MRO Maintenance Facilities
José María Córdova International Airport  Rionegro - Colombia

Client: AVIANCA - 2014

SCADIA develops all deigns for architectural discipline, also technical coordination whit engineering teams, for a main to 28.000 m2 hangar and workshops building  and a 20.000 m2 for the apron and taxiway required.


Architecture Designs for Adjustment of Commercial Zones
José María Córdova International Airport Rionegro - Colombia

Passenger Terminal -  Commercial Restructuration
Client: AIRPLAN S.A 2018.

Architectural designs about new commercial areas inside passenger terminal,both domestic and international docks for AIRPLAN S.A airport operator


Architecture Designs for Adjustment of Commercial Zones
Enrique Olaya Herrera Airport Medellín - Colombia

Passenger Terminal - Commercial Zone Restructuration
Client: AIRPLAN S.A 2018.

The architectural development was carried out for the adjustment of commercial areas in the passenger terminal building, for the AIRPLAN SA concessionaire, the adjustment was focused on the redesign of access to security control, commercial area, VIP rooms, boarding room, bathrooms.


Architectural Designs & Capacity Studies for Regional Terminals

Architectural Designs & Capacity Studies for the Regional Passenger Terminals Improvements and Expansion.
Client: AIRPLAN – 2009

Modernization Studies and architectural design for AIRPLAN operator, at the 3 regional Airport included at his operational network, the buildings updates was:


Parking Lot and General Urban Design
Ernesto Cortissoz International Airport Barranquilla - Colombia

Client: EPC Barranquilla 2017

Architectural development and Urban planning for the main passenger terminal parking lot and accessibility plan. The parking count with 400 cells and 29.000 m2 develop areas.


Architectural Designs & Capacity Studies for Passenger Terminal Expansion
Enrique Olaya Herrera Airport  Medellín - Colombia

Client: AIRPLAN – 2008 – 2015

For the expansion plan at Olaya Herrera Airport advanced by the AIRPLAN SA, SCADIA SAS made all Architecture Designs and Capacity Studies for Passenger Terminal project.


Architectural designs & Capacity Studies for Passenger Terminal Expansion
José María Córdova International Airport  Rionegro - Colombia

Client: AIRPLAN 2008 -2015

For the expansion plan at José María Cordova de Rionegro Airport advanced by the AIRPLAN SA, SCADIA SAS made all Architecture Designs and Capacity Studies for Passenger Terminal project.


Architectural designs & Capacity Studies for Passenger Terminal Expansion
Los Garzones International Airport Montería Colombia

Client: AIRPLAN – 2009 - 2014

For the expansion plan at Los Garzones Airport advanced by the AIRPLAN SA, SCADIA SAS made all Architecture Designs and Capacity Studies for Passenger Terminal project.


Modernization Design for TPA Puente Aéreo Building & Apron
El Dorado International Airport Bogotá - Colombia

Client : AVIANCA – 2006

SCADIA  SAS develop all Architectural designs and technical coordination for a modernization plan at this alternative airport in Bogota, manage at the moment for AVIANCA airline, the scope of work was:


SEI Fire Stations Buildings
Architectural and Technical Designs

Architectural designs for the development of airside airport buildings, SEI Fire Station type, as well as updates to these facilities, following the ICAO and RAC regulatory requirements.


Modernization Design for TPA Apron configuration
El Dorado International Airport Bogotá - Colombia

Client: AVIANCA - 2011

To update all Apron configuration, SCADIA SAS develop an alternative study for the operation migration to A320, A-319 y A-318 new airline equipment, based al TPA Bogota existing areas.